Schack® Waste Heat Recovery
Systems.Schack® Convection Banks
Lenght > 60

Q-T-Diagram directly derived from coil calculation software:

| Included in our design and scope are: |
| Process relevant section : |
|
- Feed/steam superheater
- Prereformer feed superheater
- Natural gas preheater
|
| Waste heat recovery section: |
|
- Steam superheater
- Steam
generator
- Combustion air preheater
- Condensate preheater
|
| Optional: |
|
- Flue gas reheater = duct burner
|
Design Concept for Schack® Convection Banks
 |
ALSTOM Power Energy Recovery GmbH’s design concept has been developed
and optimized since 1960:
- Tubes welded to horizontal headers
- Tubes can freely expand downward
- No tube sheets, only baffle and guiding plates
- Small tubes < 2” are used
- Maximum prefabrication extent
-
Modular Design:
Tube bundles are delivered already installed in a refractory
lined casing
|
 |
Schack® Convection Banks are of Modular Design
- Critical welds are manufactured at original workshop
- All tests including, hydrostatic tests are performed before delivery
- Refractory work at workshop, no scaffolding on site
- Optimized fit of coils to casing, no interface problems on site
- Low erection time and costs


5 Modules of a SchackŪ Convection Bank after arrival on site, ready for installation.